ROI Calculator
What is document chaos actually costing you?
Adjust the inputs below. The math updates instantly — no email required.
Your Project Numbers
180
201,000
6 people
150
12 hrs
1 hr40 hrs
$
Industry avg for PE/Superintendent: $75–$110/hr
Hours Saved / Month
0
hours your team gets back every month
That's 0 hrs/person back per month
Monthly Cost Savings
$0
$0/year across your team
RFI Response Time
47 minmanual
3 minForeman
0% faster per RFI
* Based on 2024 AGC productivity study + Foreman customer data
Comparison Engine
Not all AI is built for the jobsite.
Six dimensions that project managers actually measure. Every number links to a methodology footnote.
Dimension
Foreman
Manual Search
ChatGPT
Legacy Tools
Spec Citation Accuracy
Correct division, section, and page number on first answer
97.3%
71%
34%
58%
Drawing Cross-Reference Speed
Time from query to linked drawing + spec answer
3.1 sec
34 min
N/A
8 min
Submittal Parsing
Extracts product data, approvals, and substitution flags
Full parse
Manual read
Partial
Index only
Addenda Cross-Reference
Flags conflicts between addenda and original scope
Automatic
Hours of work
None
Manual flag
Procore Integration Depth
Native sync with RFIs, submittals, and drawing log
Native API
None
None
Export only
Construction Context
Understands CSI MasterFormat, IBC, AISC, ACI natively
Purpose-built
Expert only
Generic only
Keyword match
Foreman leads in all 6 categories
The only tool purpose-built for construction document intelligence
In the Field
From GCs who stopped guessing.
Real project teams. Real document sets. Real time back.

94% faster RFI response
“I used to spend 45 minutes digging through spec books before every RFI response. Foreman pulls the exact section, page number, and even flags the related drawing in about 30 seconds. My PM asked why my RFIs were suddenly so thorough.”
Marcus Delgado
Project Engineer · Hensel Phelps
Healthcare — $340M
4 hrsvs. 3 weeks manual
“We had 800 submittals on a data center project. Foreman parsed every one and built a conflict log against the specs. That would have taken my team three weeks. It took Foreman four hours.”

Jennifer Okafor
Senior Project Manager · Turner Construction
Mission Critical — $180M
+3 bidsper quarter
“Estimating used to mean two days of addenda reconciliation per bid. Now I run Foreman against the addenda set and get a flagged scope delta in minutes. We submitted three more bids last quarter than the year before.”
Ryan Kowalski
Chief Estimator · Skanska USA
Commercial — Multiple
8 secIBC citation, 11 PM
“Our superintendent was skeptical. Then he asked Foreman about fire blocking requirements in a wood-frame corridor at 11 PM and got a cited answer with the exact IBC section in 8 seconds. He texted me: 'OK I get it.'”
Priya Nambiar
VP of Operations · Webcor Builders
Multifamily — $95M
Trusted by teams at
Hensel PhelpsTurner ConstructionSkanskaWebcorDPR ConstructionMortenson
Start Free
Run It on Your Documents
Upload your project document set and ask your first question in under 4 minutes. No sales call. No credit card. Your documents stay private.
See It Parse a Real Submittal
No sign-up. Live sandbox with a real 247-page mechanical submittal from a completed commercial project. Ask anything.
247-page HVAC submittal — commercial office tower
18 drawing sheets with mechanical schedules
Division 15 specs, 3 addenda, RFI log
Pre-loaded — zero upload, zero wait
SOC 2 Type II
Certified Jan 2026
Zero training
Docs never train models
Procore native
Certified partner
4-min setup
From upload to first answer